Contact Us For Above Ground Pool Packages and Installation Availability 2025!

Integrity Pool Builders
  • Home
  • Above Ground Pools
    • AquaLeader Pool Models
  • Pool Equipment
    • Pool Equipment
  • Liners
    • Aquiform Liners
  • DIY Kits
    • DIY Kits
  • Clearance
  • Pool Tips
    • Closing Your Pool
    • Opening Your Pool
    • Maintaining Your Pool
  • Owners
  • Customer Service
    • Privacy Policy
    • Warranty Information
    • Installation Process
    • Information Package
  • More
    • Home
    • Above Ground Pools
      • AquaLeader Pool Models
    • Pool Equipment
      • Pool Equipment
    • Liners
      • Aquiform Liners
    • DIY Kits
      • DIY Kits
    • Clearance
    • Pool Tips
      • Closing Your Pool
      • Opening Your Pool
      • Maintaining Your Pool
    • Owners
    • Customer Service
      • Privacy Policy
      • Warranty Information
      • Installation Process
      • Information Package
Integrity Pool Builders
  • Home
  • Above Ground Pools
    • AquaLeader Pool Models
  • Pool Equipment
    • Pool Equipment
  • Liners
    • Aquiform Liners
  • DIY Kits
    • DIY Kits
  • Clearance
  • Pool Tips
    • Closing Your Pool
    • Opening Your Pool
    • Maintaining Your Pool
  • Owners
  • Customer Service
    • Privacy Policy
    • Warranty Information
    • Installation Process
    • Information Package

Installation Process

Above Ground Pool Installation Information


Included In Installation Pricing:

Pool installation includes leveling within 6 inches of grade, ½ inch foam bottom and cove, j-bead, leveling stones, a 2x4 patio stone equipment pad, and screenings for the pool base. The service also covers plumbing up to 5 feet from the skimmer. Pricing applies within Simcoe County limits. A one-year warranty is provided on pool installations.


Not Included In Installation Pricing:

The following services are not included and may require additional charges: sod disposal, water for pool filling, grading adjustments exceeding 6 inches, retention of the limestone base for significant build-ups, electrical work, and gas hookups for heaters, poured concrete pads.


Extra Charges To Consider When Planning For Your Above Ground Pool:

As you prepare for your pool installation, please be aware that there may be additional costs not included in the base installation. The following items are not covered by Integrity Pool Builders Inc. and require separate arrangements:


  • Electrical work and outlets required to operate pool equipment
  • Gas line installation for pool heaters
  • Poured concrete pad for gas heaters, as required by building code
  • Sod removal from the installation area
  • Retaining walls for installations involving significant grade build-up
  • Excavation with heavy machinery

We encourage all customers to review these potential extras in advance to avoid unexpected costs and to ensure a smooth installation process.


Trip Charges:

There are no additional trip charges for locations within Simcoe County. For destinations outside Simcoe County or beyond a 30-minute drive from Barrie, a trip charge will be evaluated and quoted accordingly.



Plumbing Process

Plumbing Process For Your Above Ground Pool


1. Once your above ground pool installation is complete and the installation team has departed, the base of the pool will be filled with water, and the liner will be properly set and prepared for filling. Please note that plumbing is not completed at this stage.


2. We recommend filling your pool using a garden hose rather than a water delivery truck. Gradually filling the pool with hose water allows the liner to stretch and settle evenly, reducing the risk of damage.


3. Continue filling the pool during the day and turn off the water overnight. Continue this process until the water level reaches approximately two inches below the circular jet cutout on the pool wall.


4. Once the water reaches this level, please contact your pool supplier to schedule the plumbing. The time required to fill your pool will vary based on its size and your home’s water pressure, but typically takes several days.


5. Plumbing appointments are scheduled in the order that pools were completed and not based on urgency or preference. Pools installed on Mondays or Tuesdays are generally plumbed by the end of the same week. Pools installed later in the week (Wednesday through Friday) are usually plumbed the following week, although this may vary.


6. Prior to the plumbing appointment, your pool equipment will be placed on the designated equipment pad. If you have a gas heater, a concrete pad (minimum 6 ft x 3 ft) is required to meet code, which the customer is responsible for having poured. For systems without a heater, our installers will prepare a 2 ft x 4 ft pad using patio stones.


7. During the plumbing visit, the technician will connect the skimmer, return jet, and all essential equipment components such as the pump, filter, chlorinator, salt system, and heater (if applicable). Please note: we do not perform gas line or electrical connections. Our service is limited to plumbing the water-side components only.


8. Once plumbing is complete, the technician will test-run the system and provide a full overview of your pool equipment, including operational guidance. At this point, your plumbing setup is considered complete.

Installation Process

Ground Preparation

Limestone Screenings Base & Levelling

Limestone Screenings Base & Levelling

  • Sod is peeled and placed in customers yard (sod removal from yard is not included).
  • If there is a grading difference in the yard we will dig down from the high side and use that dirt to even out of the ground on the low side.
  • No heavy machinery is used.

Limestone Screenings Base & Levelling

Limestone Screenings Base & Levelling

Limestone Screenings Base & Levelling

  • Limestone screenings is used for the base of the pool and compacted with a gas powered tamper.
  • 1x1 patio stones are set under each upright foot and side support (buttress) and levelled off with a laser level.

Wall Stand & Foam Bottom

Liner Installation & Plumbing

Liner Installation & Plumbing

  • After the wall is standing we install a half inch foam bottom with foam cove for superior comfort and protection for your liner.
  • The base is inspected for any debris or harmful objects before we install the liner.

Liner Installation & Plumbing

Liner Installation & Plumbing

Liner Installation & Plumbing

  • The liner is installed and the remaining components of the pool are put together.
  • An inch of water by garden hose is added to the base of the pool so the installers can kick out wrinkles and set the liner.
  • The customer will then continue to fill the pool by garden hose over the span of a few days until the height of the water reaches a couple inches below the jet hole.
  • At this point our plumber will be scheduled to come and complete the plumbing portion.

Integrity Pool Builders Inc.

Barrie, Ontario, Canada

226-821-3066

Copyright © 2025 integritypoolbuilders - All Rights Reserved.

Canadian Manufactured Pools

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept